top of page

On this job we replaced the old bath with a new one whilst building the back wall out to conceal the pipework for the divergent valve. Beforehand it was half tiled but the client decided to have the whole room tiled to ceiling on this occassion.  New Units along the backwall provided plenty of storage space and hid the pipework runing along the back. The ceiling was smoothed over and painted along with the woodwork around and including the door.

bottom of page