This Job consisted of refurbishing the outdated bathroom as well as the downstairs toilet.  The old carpeted bathroom was replaced with click together flooring, the bath modernised with a digital shower valve and handheld to provide different methods of washing and the waste for all the facilities was hidden to provide a complete look across the room.  Downstairs mirrored the same theme with a freshened image for the household.

Abbey Road 1
Abbey Road 1

Before the Rip Out

press to zoom
Abbey Road 5
Abbey Road 5

During the tiling phase end of week 1

press to zoom
0bc23149-ba52-41ea-9fc2-fce31e018c8f
0bc23149-ba52-41ea-9fc2-fce31e018c8f

Concealed pipework on the right for the basin feeds

press to zoom
Abbey Road 1
Abbey Road 1

Before the Rip Out

press to zoom